Emeritec works at a base rate of 295 point-to-point for hydro excavation services. Understandably, many variables affect cost beyond the base estimate. Here are some factors to consider.
Overtime: If we need to work past regular business hours, our rates will change.
Project Scope: If there is enough work, it will make sense to bring more than one truck and extra personnel.
Long Distance From Road: Some holes need to be dug but will require extensions on the vac truck; this will take additional time to set up and take down.
Soil Type: Clay and some gravel require longer excavation times.